CBC Grade 9 KJSEA Pre-Technical Studies Mid Term 3 Exam
Test 17 — Pretechnical Studies PP2 (Digitized Simulation, Midterm) · Pretechnical Studies PP2 (Digitized Simulation, KJSEA Prediction Series Midterm) · 8 questions
Topics: Communication in Pre-Technical Studies, Tools and Production.
All 8 questions with answers
- Question 1: Using the isometric view of a rectangular serving tray with two equal compartments shown below, draw the following orthographic views in…Answer: A correct answer lays out three views in first-angle projection: End Elevation to the left of the Front…
- Question 2: A carpenter is preparing a dovetail joint from two pieces of softwood timber, each 150mm x 40mm x 20mm. Explain how the tails and pins of…Answer: Use a marking gauge to scribe the baseline (shoulder line) on both pieces, set to the timber's 20mm…
- Question 3: Describe the correct sequence and technique for cutting a dovetail joint by hand, so that the cuts are straight, at the correct depth, and…Answer: Secure the timber firmly in a vice. Using a tenon saw, cut down the waste side of each marked tail/pin line,…
- Question 4: After assembling a dovetail joint, a learner notices a 2mm gap on one side of the joint and the surfaces are not flush. (a) Suggest the…Answer: Likely cause: inaccurate marking-out or sawing outside the marked line (the tail or pin was cut…
- Question 5: State one finishing practice that should be applied to a completed wooden joint. (1 mark)Answer: Sand the joint smooth and remove any splinters/rough edges.
- Question 6: Draw a circuit diagram showing a battery (2 cells), a single SPST switch, a bulb, and a buzzer connected in SERIES so that both the bulb…Answer: A correct series circuit connects the battery (2 cells), SPST switch, bulb, and buzzer in a single loop, one…
- Question 7: Explain why the bulb and buzzer must be connected in SERIES (not parallel) for this task, and what would happen if one component in the…Answer: The task requires the components in series because the design calls for a single current path through the…
- Question 8: State one good practice for keeping the wiring neat, and one safety precaution to observe when assembling this circuit. (2 marks)Answer: Neatness: keep wires trimmed to length and routed tidily, avoiding tangling or crossing unnecessarily.…